MATNR |
Material Number |
CHAR |
40 |
0 |
|
MATNR
|
|
WERKS |
Plant |
CHAR |
4 |
0 |
|
WERKS_D
|
|
BERID |
MRP Area |
CHAR |
10 |
0 |
|
BERID
|
|
MAKTX |
Material Description |
CHAR |
40 |
0 |
|
MAKTX
|
|
CM61M |
|
STRU |
0 |
0 |
|
CM61M
|
|
BANER |
Creation Indicator for Purchase Requisitions |
CHAR |
1 |
0 |
|
BANER
|
1 |
Purchase requisitions |
2 |
Purchase requisitions in opening period |
3 |
Planned orders |
|
LIFKZ |
Automatic Schedule Lines (Scheduling Agreements) |
CHAR |
1 |
0 |
|
LIFKZ
|
1 |
No schedule lines |
2 |
Schedule lines in the opening period |
3 |
Schedule lines |
|
DISER |
Creation Indicator for MRP Lists |
CHAR |
1 |
0 |
|
DISER
|
1 |
MRP list |
2 |
Depending on the exception messages |
3 |
No MRP list |
|
WERTU |
Value Updating in Material Master Record |
CHAR |
1 |
0 |
|
WERTU
|
|
MENGU |
Quantity Updating in Material Master Record |
CHAR |
1 |
0 |
|
MENGU
|
|
ANDEC |
No. of decimal places for rounding |
INT2 |
5 |
0 |
|
ANDEC
|
|
USEQU |
Quota arrangement usage |
CHAR |
1 |
0 |
|
USEQU
|
|
SBDIS |
Share of safety stock which can be used for planning |
NUMC |
3 |
0 |
|
SBDIS
|
|
ICBED |
Reorder point planning with external requirements |
CHAR |
1 |
0 |
|
ICBED
|
|
Ignored |
1 |
External requirements in total horizon |
2 |
External requirements within replenishment lead time |
|
FXART |
Firming Type of the Planning Result |
CHAR |
1 |
0 |
|
FXART
|
|
|
0 |
Planning results not firmed |
1 |
Automatic firming and order proposals rescheduled out |
2 |
Automatic firming without order proposal |
3 |
Manual firming and order proposals rescheduled out |
4 |
Manual firming without order proposal |
|
FXHOR |
Planning time fence |
NUMC |
3 |
0 |
|
FXHOR
|
|
FIXTR |
End of planning time fence (date) |
DATS |
8 |
0 |
|
FIXTR
|
|
MFHKZ |
Planning time fence set manually (MFXDT) |
CHAR |
1 |
0 |
|
MFHKZ
|
|
RESPL |
Indicator: delete firm planned orders |
CHAR |
1 |
0 |
|
RESPL
|
|
Do not delete firm planned orders |
1 |
Delete firm planned orders |
|
RESHZ |
Roll forward period for the master plan |
DEC |
2 |
0 |
|
RESHZ
|
|
RSTER |
End of roll forward period |
DATS |
8 |
0 |
|
RSTER
|
|
UMTHZ |
Rescheduling horizon |
NUMC |
3 |
0 |
|
UMTHZ
|
|
UMTER |
End of rescheduling horizon (date) |
DATS |
8 |
0 |
|
UMTER
|
|
VWVOR |
Tolerance value for bringing forward receipt elements |
NUMC |
2 |
0 |
|
VWVOR
|
|
VWVER |
Tolerance value for displacement in the future |
NUMC |
2 |
0 |
|
VWVER
|
|
PLAHZ |
Planning horizon |
NUMC |
3 |
0 |
|
PLAHZ
|
|
PLTER |
End of planning horizon |
DATS |
8 |
0 |
|
PLTER
|
|
WZTER |
End of replenishment lead time |
DATS |
8 |
0 |
|
WZTER
|
|
KZREG |
Indicator: plan material regularly |
CHAR |
1 |
0 |
|
KZREG
|
|
ANDIS |
Number of Days After Which the Material Must Be Planned |
INT2 |
5 |
0 |
|
ANDIS
|
|
RHDAT |
Next planning date for time-phased planning |
DATS |
8 |
0 |
|
RHDAT
|
|
RHEND |
End of the requirements period for time-phased MRP |
DATS |
8 |
0 |
|
RHEND
|
|
RYBED |
Time-phased planning with requirements (MRP) |
CHAR |
1 |
0 |
|
RYBED
|
|
VRMOD |
Consumption mode |
CHAR |
1 |
0 |
|
VRMOD
|
1 |
Backward consumption only |
2 |
Backward/forward consumption |
3 |
Forward consumption only |
4 |
Forward/backward consumption |
5 |
Period-specific consumption |
|
VINT1 |
Consumption period: backward |
NUMC |
3 |
0 |
|
VINT1
|
|
VINT2 |
Consumption period: forward |
NUMC |
3 |
0 |
|
VINT2
|
|
VPLAN |
Single-Character Flag |
CHAR |
1 |
0 |
|
CHAR1
|
|
VPLAV |
Single-Character Flag |
CHAR |
1 |
0 |
|
CHAR1
|
|
VTYPE |
Planning Variant |
CHAR |
1 |
0 |
|
XVPLB
|
|
STDPD |
Configurable material |
CHAR |
40 |
0 |
|
STDPD
|
|
RVPKZ |
Adjustment of Planned Independent Requirements |
CHAR |
1 |
0 |
|
RVPKZ
|
|
No adjustment |
1 |
Adjustment in the future |
2 |
Adjustment in the past |
3 |
Adjustment in the future - only indep.reqmts w. consumption |
4 |
Adjustment in the past - only indep. reqmts w. consumption |
|
RESVP |
Period of adjustment for planned independent requirements |
DEC |
3 |
0 |
|
RESVP
|
|
RVPTR |
End of adjustment period for planned independent reqmts |
DATS |
8 |
0 |
|
RVPTR
|
|
EXSGT |
Do Not Explode Bulk Material Items |
CHAR |
1 |
0 |
|
EXSGT
|
|
BESAL |
Determine Explosion Date for BOM and Routing |
CHAR |
1 |
0 |
|
BESAL
|
|
BOM explosion number/order start date |
1 |
Order start date |
2 |
Order finish date |
3 |
BOM explosion number/order start date |
4 |
BOM explosion number/order finish date |
|
GTERM |
Scheduling according to purchasing info record or agreement |
CHAR |
1 |
0 |
|
GTERM
|
|
KZDRB |
Indicator: direct procurement/production MRP |
CHAR |
1 |
0 |
|
KZDRB
|
|
Direct procurement only when creating production order |
1 |
Trigger direct procurement in requirements planning |
2 |
Direct procurement only when creating production order |
3 |
Trigger direct procurement in requirements planning |
|
SETYP |
Single-Character Flag |
CHAR |
1 |
0 |
|
CHAR1
|
|
PLNKZ |
Planning Indicator |
CHAR |
1 |
0 |
|
PLNKZ
|
1 |
Net requirements planning |
2 |
Gross requirements planning |
3 |
Single-item planning |
|
OSELT |
Above selection date |
DATS |
8 |
0 |
|
OSELT
|
|
PRREG |
Checking rule for the availability check |
CHAR |
2 |
0 |
|
PRREG
|
|
SUMAU |
Total sales order requirements |
CHAR |
1 |
0 |
|
SUMAU
|
|
RWFLG |
Calculate safety stock based on range of coverage |
CHAR |
1 |
0 |
|
RWFLG
|
|
RWPER |
Period for Calculating the Dynamic Safety Stock |
CHAR |
1 |
0 |
|
RWPER
|
K |
PP planning calendar |
M |
Month |
W |
Week |
|
RWANZ |
Number of periods for determining the average |
NUMC |
2 |
0 |
|
RWANZ
|
|
RWART |
Period length type for calculating the average |
CHAR |
1 |
0 |
|
RWART
|
1 |
Workdays |
2 |
Calendar days |
3 |
Standard days |
|
RWNTG |
Number of days per range of coverage period |
NUMC |
2 |
0 |
|
RWNTG
|
|
RW1TG |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
RW1DT |
Planning horizon for range of coverage 01 |
DATS |
8 |
0 |
|
RW1DT
|
|
RW2TG |
Target Range of Coverage in Period 02 |
NUMC |
2 |
0 |
|
RW2TG
|
|
RW2DT |
Planning horizon for range of coverage 02 |
DATS |
8 |
0 |
|
RW2DT
|
|
RW3TG |
Target Range of Coverage in the Rest of the Period |
NUMC |
2 |
0 |
|
RW3TG
|
|
MIRW1 |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
MIRW2 |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
MIRW3 |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
MARW1 |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
MARW2 |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
MARW3 |
Target Range of Coverage in Period 01 |
NUMC |
2 |
0 |
|
RW1TG
|
|
XFAT1 |
Firm Only Schedule Lines Transmitted to Vendor by Purchasing |
CHAR |
1 |
0 |
|
XFAT1
|
|
PLIFZ |
Planned Delivery Time in Days |
DEC |
3 |
0 |
|
PLIFZ
|
|
KZBED |
Indicator for Requirements Grouping |
CHAR |
1 |
0 |
|
KZBED
|
0 |
In rep. mfg, individual record in addn to total requirements |
T |
Display of dependent requirements as a daily total |
|
PLSEL |
Issue Storage Location Selection |
CHAR |
1 |
0 |
|
PLSEL
|
1 |
Only components |
2 |
Only assemblies |
3 |
1st components / 2nd assemblies |
4 |
1st assemblies / 2nd components |
|
BSART |
MRP:doc.type purchase requisitions for standard purchase ord |
CHAR |
4 |
0 |
|
BBSRT_NB
|
|
BARTL |
MRP: Document type purchase requisition for subcontracting |
CHAR |
4 |
0 |
|
BBSRT_LB
|
|
BARTU |
MRP: purchase requisition for stock transfer - document type |
CHAR |
4 |
0 |
|
BBSRT_UL
|
|
AGREQ |
Aggregated dependent requirements (obsolete) |
CHAR |
1 |
0 |
|
AGRES
|
|
OPFDT |
Date of firm planned order last copied from MRP |
DATS |
8 |
0 |
|
OPFDT
|
|
MFXDT |
Manual firming date |
DATS |
8 |
0 |
|
MFXDT
|
|
MFNAM |
Set manual firming date: User |
CHAR |
12 |
0 |
|
MFNAM
|
|
MFDAT |
Set manual firming date: Date to set |
DATS |
8 |
0 |
|
MFDAT
|
|
MFXKZ |
Indicator: MFXDT changed |
CHAR |
1 |
0 |
|
MFXKZ
|
|
OPFKZ |
Indicator:OPFDT changed |
CHAR |
1 |
0 |
|
OPFKZ
|
|
NODUM |
No Requirements for Phantom Assemblies |
CHAR |
1 |
0 |
|
NODUM
|
|
BBBED |
Material staging reqmts (subcontr. reqmts) MRP element BB |
CHAR |
1 |
0 |
|
BBBED
|
|
U1BED |
Release for stock transfer order |
CHAR |
1 |
0 |
|
U1BED
|
|
U2BED |
Delivery schedule for a stock transfer requisition |
CHAR |
1 |
0 |
|
U2BED
|
|
U4BED |
Delivery schedule for stock transport scheduling agreement |
CHAR |
1 |
0 |
|
U4BED
|
|
A1BED |
Dependent reservation - standard orders |
CHAR |
1 |
0 |
|
A1BED
|
|
A2BED |
Dependent reservation - plant maintenance orders and network |
CHAR |
1 |
0 |
|
A2BED
|
|
GRREL |
Relevant for requirements grouping for project stock |
CHAR |
1 |
0 |
|
GRREL
|
|
AHDIS |
MRP relevancy for dependent requirements |
CHAR |
1 |
0 |
|
AHDIS
|
|
Materials for dependent requirements are planned |
1 |
Materials for dependent requirements are not planned |
|
VERTR |
Start date of order proposals allowed in the past |
CHAR |
1 |
0 |
|
VERTR
|
|
ENDWZ |
End of replenishment lead time |
DATS |
8 |
0 |
|
WZTER
|
|
FKOBS |
ATP check by full confirmation logic |
CHAR |
1 |
0 |
|
FKOBS
|
|
PSTMP |
Last Change to Planned Order: Time Stamp |
DEC |
15 |
0 |
|
PSTMP
|
|
SCFLG |
Indicator: General Subcontracting Logic |
CHAR |
1 |
0 |
|
MD_SCFLG
|
|
UMLDB |
Indicator for Stock Transfer with MRP Areas |
CHAR |
1 |
0 |
|
MD_UMLDB
|
|
Stock Transfer Reservations from the Plant to the MRP Area |
1 |
Purchase Requisitions from the Plant to the MRP Area |
|
FABKL |
Material-Specific Calendar (Range of Coverage) |
CHAR |
2 |
0 |
|
MD_FABKL_COV
|
|
CNDIF |
Reduction from Confirmation of Different Planned Orders |
CHAR |
1 |
0 |
|
MD_MES_CNF_DIF
|
|
SGT_COVS |
Segmentation Strategy |
CHAR |
8 |
0 |
|
SGT_COVS
|
|
SGT_PRCM |
Consumption Priority [Obsolete] |
CHAR |
1 |
0 |
|
SGT_PRCM
|
1 |
Based on Consumption Mode and then Segmentation |
2 |
Only if Requirement Segments Match |
3 |
Based on Segmentation and then Consumption Mode |
|
AGG_READ |
Checkbox |
CHAR |
1 |
0 |
|
XFELD
|
|
PREQAPPROVAL |
Purchase Requisition Handover to Purchasing Required |
CHAR |
1 |
0 |
|
PREQAPPROVAL
|
|
DD_U2BED |
DD MRP: Delivery schedule for a stock transfer requisition |
CHAR |
1 |
0 |
|
PPH_DD_U2BED
|
|
Always excluded |
1 |
Include firmed requirements only |
2 |
Always included |
|
DD_U4BED |
DD MRP: Delivery schedule for a STR scheduling agreements |
CHAR |
1 |
0 |
|
PPH_DD_U4BED
|
|
Always excluded |
1 |
Include firmed requirements only |
2 |
Always included |
|
DD_BBBED |
DD MRP: Subcontracting reqmts of purchase requisitions |
CHAR |
1 |
0 |
|
PPH_DD_BBBED
|
|
Always excluded |
1 |
Include firmed requirements only |
2 |
Always included |
|
DD_SBBED |
DD MRP: Dependent reqmnts of planned orders |
CHAR |
1 |
0 |
|
PPH_DD_SBBED
|
|
Always excluded |
1 |
Include firmed/repetitive (REM) requirements only |
2 |
Always included |
|
PICID |
PIC: Membership Status |
CHAR |
2 |
0 |
|
PIC_PICID
|
|
Not an interchangeable part |
01 |
Non leading part of an MPN MRP Set |
02 |
Leading part of an MPN-MRP Set |
03 |
Latest non leading part of an MPN MRP Set (A&D 3.0 compat.) |
04 |
FFF-class member, not in MPN MRP Set |
05 |
SUS chain member with successor (not last part in chain) |
06 |
SUS chain : first part / no predecessor |
07 |
SUS chain : last part / no successor |
08 |
Part is MPN and SUS member (NOT USED IN 4.6A) |
|
KZLPT |
Indicator : Leading part |
CHAR |
1 |
0 |
|
KZLMATN
|
|
Not a Member of a MPN-MRP Set |
1 |
Not a Leading Part |
2 |
Leading Part |
3 |
Last Non-Leading Part of a MPN-MRP Set |
|
DPLTR |
End of planning horizon |
DATS |
8 |
0 |
|
PLTER
|
|
DFXTR |
End of planning time fence (date) |
DATS |
8 |
0 |
|
FIXTR
|
|
INTTYPE |
Replacement Type |
CHAR |
1 |
0 |
|
PIC_INTTYPE
|
F |
Forward |
I |
Interchangeable |
|
MDSTA |
|
STRU |
0 |
0 |
|
MDSTA
|
|
KZSTA |
Single-Character Flag |
CHAR |
1 |
0 |
|
CHAR1
|
|
LABST |
Valuated Unrestricted-Use Stock |
QUAN |
13 |
3 |
|
LABST
|
|
INSME |
Stock in Quality Inspection |
QUAN |
13 |
3 |
|
INSME
|
|
SPEME |
Blocked Stock |
QUAN |
13 |
3 |
|
SPEME
|
|
EINME |
Total Stock of All Restricted Batches |
QUAN |
13 |
3 |
|
EINME
|
|
RETME |
Blocked Stock Returns |
QUAN |
13 |
3 |
|
RETME
|
|
WESPB |
Blocked Stock from Goods Receipt |
QUAN |
13 |
3 |
|
WESPB
|
|
REBST |
Reservations |
QUAN |
13 |
3 |
|
REBST
|
|
KLABS |
Unrestricted-Use Consignment Stock |
QUAN |
13 |
3 |
|
KLABS
|
|
KINSM |
Consignment Stock in Quality Inspection |
QUAN |
13 |
3 |
|
KINSM
|
|
KEINM |
Restricted-Use Consignment Stock |
QUAN |
13 |
3 |
|
KEINM
|
|
KSPEM |
Blocked Consignment Stock |
QUAN |
13 |
3 |
|
KSPEM
|
|
SLLAB |
Valuated unrestricted-use stock at vendor |
QUAN |
13 |
3 |
|
SLLAB
|
|
SLINS |
Stock in quality inspection at vendors |
QUAN |
13 |
3 |
|
SLINS
|
|
KDBST |
Sales requirements |
QUAN |
13 |
3 |
|
KDBST
|
|
BEBST |
Purchase orders |
QUAN |
13 |
3 |
|
BEBST
|
|
BEBSK |
Consignment order |
QUAN |
13 |
3 |
|
BEBSK
|
|
BANFB |
Purchase requisitions |
QUAN |
13 |
3 |
|
BANFB
|
|
PLAFB |
Planned Orders |
QUAN |
13 |
3 |
|
PLAFB
|
|
FEAUB |
Production orders in total |
QUAN |
13 |
3 |
|
FEAUB
|
|
RESBZ |
Receipt reservation |
QUAN |
13 |
3 |
|
RESBZ
|
|
UMREB |
Stock transfer reservations |
QUAN |
13 |
3 |
|
UMREB
|
|
UMABR |
Stock transfer release orders |
QUAN |
13 |
3 |
|
UMABR
|
|
UMABG |
Stock Transfer Releases (Planned) |
QUAN |
13 |
3 |
|
UMABG
|
|
PRBED |
Forecast requirements |
QUAN |
13 |
3 |
|
PRBED
|
|
VBEDA |
Requests for quotations |
QUAN |
13 |
3 |
|
VBEDA
|
|
VBEDB |
Quotations |
QUAN |
13 |
3 |
|
VBEDB
|
|
VBEDC |
Orders |
QUAN |
13 |
3 |
|
VBEDC
|
|
VBEDE |
Scheduling agreements |
QUAN |
13 |
3 |
|
VBEDE
|
|
VBEDG |
Contracts |
QUAN |
13 |
3 |
|
VBEDG
|
|
VBEDI |
Deliveries free of charge |
QUAN |
13 |
3 |
|
VBEDI
|
|
VBEDJ |
Deliveries |
QUAN |
13 |
3 |
|
VBEDJ
|
|
SKBED |
Dependent requirements |
QUAN |
13 |
3 |
|
SKBED_D
|
|
UMREN |
Denominator for conversion to base units of measure |
DEC |
5 |
0 |
|
UMREN
|
|
UMREZ |
Numerator for Conversion to Base Units of Measure |
DEC |
5 |
0 |
|
UMREZ
|
|
SKBEZ |
Total quantity of the receipt dependent requirements |
QUAN |
13 |
3 |
|
SKBEZ
|
|
PRIMB |
Planned independent requirements |
QUAN |
13 |
3 |
|
PRIMB
|
|
SFDEM |
Safety Demands |
QUAN |
13 |
3 |
|
PPH_SFDEM
|
|
SFDEZ |
Receipt Safety Demands |
QUAN |
13 |
3 |
|
PPH_SFDEZ
|
|
SUM01 |
Warehouse stock / total (including special stor.locs) |
QUAN |
13 |
3 |
|
SUM01
|
|
SUM02 |
Total of promised receipts |
QUAN |
13 |
3 |
|
SUM02
|
|
SUM03 |
Total of planned receipts |
QUAN |
13 |
3 |
|
SUM03
|
|
SUM04 |
Total of promised issues |
QUAN |
13 |
3 |
|
SUM04
|
|
SUM05 |
Total of planned issues |
QUAN |
13 |
3 |
|
SUM05
|
|
UMLMC |
Stock in transfer (plant to plant) |
QUAN |
13 |
3 |
|
UMLME
|
|
TRAME |
Stock in Transit |
QUAN |
13 |
3 |
|
TRAME
|
|
UMLME |
Stock in transfer (from one storage location to another) |
QUAN |
13 |
3 |
|
UMLMD
|
|
BSRET |
Returns |
QUAN |
13 |
3 |
|
BSRET
|
|
RETRL |
Release Orders for Returns |
QUAN |
13 |
3 |
|
RETRL
|
|
REQDUE |
Requirement Quantity Subject to Delay |
QUAN |
13 |
3 |
|
MD_REQDUE
|
|
REQCUR |
Requirement Quantity in Current Period |
QUAN |
13 |
3 |
|
MD_REQCUR
|
|
REQNX1 |
Requirement Quantity Next Period |
QUAN |
13 |
3 |
|
MD_REQNX1
|
|
REQNX2 |
Requirement Quantity Period After Next |
QUAN |
13 |
3 |
|
MD_REQNX2
|
|
RECDUE |
Receipt Quantity Subject to Delay |
QUAN |
13 |
3 |
|
MD_RECDUE
|
|
RECCUR |
Receipt Quantity in Current Period |
QUAN |
13 |
3 |
|
MD_RECCUR
|
|
RECNX1 |
Receipt Quantity in Next Period |
QUAN |
13 |
3 |
|
MD_RECNX1
|
|
RECNX2 |
Receipt Quantity in Period After Next |
QUAN |
13 |
3 |
|
MD_RECNX2
|
|
REQSUM |
Total Requirements in Periods (Including Safety Stock) |
QUAN |
13 |
3 |
|
MD_RQSUM
|
|
RECSUM |
Total of Receipts in Periods Plus Stock |
QUAN |
13 |
3 |
|
MD_RCSUM
|
|
PCURR |
Current Period |
CHAR |
10 |
0 |
|
MD_PCURR
|
|
PNEX1 |
Next Period |
CHAR |
10 |
0 |
|
MD_PNEX1
|
|
PNEX2 |
Period After Next |
CHAR |
10 |
0 |
|
MD_PNEX2
|
|
PZCURR |
Current Period |
CHAR |
10 |
0 |
|
MD_PCURR
|
|
PZNEX1 |
Next Period |
CHAR |
10 |
0 |
|
MD_PNEX1
|
|
PZNEX2 |
Period After Next |
CHAR |
10 |
0 |
|
MD_PNEX2
|
|
PERKZ |
Period Indicator |
CHAR |
1 |
0 |
|
PERKZ_MRP
|
|
Initial Value |
K |
Planning According to Planning Calendar |
M |
Monthly |
P |
Period According to Fiscal Year Variant |
T |
Daily |
W |
Weekly |
|
MRPPP |
PPC Planning Calendar |
CHAR |
3 |
0 |
|
MRPPP
|
|
CUTDT |
Evaluation End Date for Statistics |
DATS |
8 |
0 |
|
MD_CUTDT
|
|
KEBST |
Total Individual Sales Order Stocks |
QUAN |
13 |
3 |
|
MD_KEBST
|
|
PRBST |
Total Individual Project Stocks |
QUAN |
13 |
3 |
|
MD_PRBST
|
|
EZBST |
Total of Individual Stocks (Project and Sales Order) |
QUAN |
13 |
3 |
|
MD_EZBST
|
|
KOBST |
Total Consignment Stock |
QUAN |
13 |
3 |
|
MD_KOBST
|
|
UMBST |
Stock in Transfer (Total) |
QUAN |
13 |
3 |
|
MD_UMBST
|
|
LBBST |
Total Subcontracting Stock |
QUAN |
13 |
3 |
|
MD_LBBST
|
|
GSBST |
Total of All Stocks Including Individual Stocks |
QUAN |
13 |
3 |
|
MD_GSBST
|
|
ABBED |
Stock Transfer Releases (Total) |
QUAN |
13 |
3 |
|
MD_ABBED
|
|
EISBE |
Safety Stock |
QUAN |
13 |
3 |
|
EISBE
|
|
SLUML |
Stock in Transfer for Subcontracting (Plant to Plant) |
QUAN |
13 |
3 |
|
UMLME_O
|
|
BWESB |
Valuated Goods Receipt Blocked Stock |
QUAN |
13 |
3 |
|
BWESB
|
|
IMWME |
Quantity 'in plant' |
QUAN |
13 |
3 |
|
IMWME
|
|
MDKP |
|
STRU |
0 |
0 |
|
MDKP
|
|
MANDT |
Client |
CLNT |
3 |
0 |
|
MANDT
|
|
DTART |
Type of MRP list |
CHAR |
2 |
0 |
|
DTART
|
LP |
Long-Term Planning |
MD |
Material requirements planning |
|
MATNR |
Material Number |
CHAR |
40 |
0 |
|
MATNR
|
|
PLWRK |
Plant |
CHAR |
4 |
0 |
|
WERKS_D
|
|
PLSCN |
Planning Scenario in Long-Term Planning |
NUMC |
3 |
0 |
|
PLSCN
|
|
DTNUM |
Number of material requirements planning table |
NUMC |
10 |
0 |
|
DTNUM
|
|
DSDAT |
MRP date |
DATS |
8 |
0 |
|
DSDAT
|
|
BDBKZ |
Selection indicator for processed MRP lists |
CHAR |
1 |
0 |
|
BDBKZ
|
|
SLKZ1 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ2 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ3 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ4 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ5 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ6 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ7 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
SLKZ8 |
Selection indicator for exception groups |
CHAR |
1 |
0 |
|
SLKZX
|
|
VRKZ1 |
Processing indicator 01 |
CHAR |
1 |
0 |
|
VRKZ1
|
|
VRKZ2 |
Processing indicator 02 |
CHAR |
1 |
0 |
|
VRKZ2
|
|
VRKZ3 |
Processing indicator - 03 |
CHAR |
1 |
0 |
|
VRKZ3
|
|
MTART |
Material type |
CHAR |
4 |
0 |
|
MTART
|
|
MEINS |
Base Unit of Measure |
UNIT |
3 |
0 |
|
MEINS
|
|
DISST |
Low-Level Code |
CHAR |
3 |
0 |
|
DISST
|
|
BESKZ |
Procurement Type |
CHAR |
1 |
0 |
|
BESKZ
|
|
No Procurement |
E |
In-House Production |
F |
External Procurement |
X |
Both Procurement Types |
|
SOBSL |
Special procurement type |
CHAR |
2 |
0 |
|
SOBSL
|
|
SOBES |
Special procurement type |
CHAR |
1 |
0 |
|
SOBES
|
0 |
Standard external procurement |
2 |
Consignment |
3 |
Subcontracting |
7 |
Stock transfer |
9 |
IS-OIL only: Stock transfer reservation |
E |
Standard in-house production |
P |
Production in plant 2 |
|
WRK02 |
Planning/production plant |
CHAR |
4 |
0 |
|
WRK02
|
|
DISMM |
MRP Type |
CHAR |
2 |
0 |
|
DISMM
|
|
DISVF |
MRP Procedure |
CHAR |
1 |
0 |
|
DISVF
|
B |
Reorder Point Planning |
C |
Demand-Driven Replenishment |
D |
Material Requirements Planning |
M |
Master Production Scheduling |
N |
No MRP |
R |
Time-Phased Materials Planning |
S |
Forecast-Based Planning |
W |
Replenishment (IS Retail) |
X |
Without MRP, with BOM Explosion |
|
DISPO |
MRP Controller |
CHAR |
3 |
0 |
|
DISPO
|
|
PLDIS |
Planning controller (no longer used) |
CHAR |
3 |
0 |
|
PLDIS
|
|
EKGRP |
Purchasing Group |
CHAR |
3 |
0 |
|
EKGRP
|
|
MTWZT |
Material replenishment lead time |
DEC |
3 |
0 |
|
MTWZT
|
|
WEBAZ |
Goods receipt processing time in days |
DEC |
3 |
0 |
|
WEBAZ
|
|
BEAZT |
Processing time for purchase order proposal |
DEC |
3 |
0 |
|
BEAZT
|
|
FIXTR |
End of planning time fence (date) |
DATS |
8 |
0 |
|
FIXTR
|
|
MFHKZ |
Planning time fence set manually (MFXDT) |
CHAR |
1 |
0 |
|
MFHKZ
|
|
DISLS |
Lot Sizing Procedure within Materials Planning |
CHAR |
2 |
0 |
|
DISLS
|
|
LOSVF |
Lot-sizing procedure for short-term period |
CHAR |
1 |
0 |
|
LOSVF
|
O |
Optimum lot-sizing procedure |
P |
Period lot-sizing procedure |
S |
Static lot-sizing procedure |
|
LOSKZ |
Lot-size indicator for the short-term period |
CHAR |
1 |
0 |
|
LOSKZ
|
D |
Dynamic lot size creation |
E |
Lot-for-lot order quantity |
F |
Fixed lot size |
G |
Groff reorder procedure |
H |
Replenish to maximum stock level |
K |
Period lot size as in PPC planning calendar |
M |
Monthly lot size |
P |
Period lot sizes according to posting periods |
S |
Stat.lot size: fixed w. splitting/dyn.lot size: part pd bal. |
T |
Daily lot size |
W |
Period lot size: weekly lot/dyn. lot-sizing: least unit cost |
|
PERAZ |
Number of Periods for the Short-Term Area |
DEC |
3 |
0 |
|
PERAZ
|
|
EISBE |
Safety Stock |
QUAN |
13 |
3 |
|
EISBE
|
|
MINBE |
Reorder Point |
QUAN |
13 |
3 |
|
MINBE
|
|
HOEBE |
Maximum Stock Level |
QUAN |
13 |
3 |
|
MABST
|
|
BSTMI |
Minimum Lot Size |
QUAN |
13 |
3 |
|
BSTMI
|
|
BSTMA |
Maximum Lot Size |
QUAN |
13 |
3 |
|
BSTMA
|
|
BSTFX |
Fixed lot size |
QUAN |
13 |
3 |
|
BSTFE
|
|
BSTRF |
Rounding value for purchase order quantity |
QUAN |
13 |
3 |
|
BSTRF
|
|
SUM01 |
Plant stock / only plant segment |
QUAN |
13 |
3 |
|
SUM01W
|
|
SUM02 |
No longer used/do not use!! |
QUAN |
13 |
3 |
|
NOUSE
|
|
SUM03 |
No longer used/do not use!! |
QUAN |
13 |
3 |
|
NOUSE
|
|
SUM04 |
No longer used/do not use!! |
QUAN |
13 |
3 |
|
NOUSE
|
|
SUM05 |
No longer used/do not use!! |
QUAN |
13 |
3 |
|
NOUSE
|
|
NEGBS |
Negative stock |
QUAN |
13 |
3 |
|
NEGBS
|
|
MSGID |
Message identification |
CHAR |
20 |
0 |
|
MSGID
|
|
MSGAR |
Message Type |
CHAR |
1 |
0 |
|
MSGTY
|
|
MSGNR |
Message number |
CHAR |
3 |
0 |
|
MSGNR
|
|
MSGV1 |
Message variable 01 |
CHAR |
50 |
0 |
|
MSGV1
|
|
MSGV2 |
Message variable 02 |
CHAR |
50 |
0 |
|
MSGV2
|
|
MSGV3 |
Message variable 03 |
CHAR |
50 |
0 |
|
MSGV3
|
|
MSGV4 |
Message variable 04 |
CHAR |
50 |
0 |
|
MSGV4
|
|
DISGR |
MRP Group |
CHAR |
4 |
0 |
|
DISGR
|
|
PERIV |
Fiscal Year Variant |
CHAR |
2 |
0 |
|
PERIV
|
|
MRPPP |
PPC Planning Calendar |
CHAR |
3 |
0 |
|
MRPPP
|
|
BDARF |
Requirements quantity from material requirements planning |
QUAN |
13 |
3 |
|
BDARF
|
|
LFRHY |
Planning Cycle |
CHAR |
3 |
0 |
|
LFRHY
|
|
RDPRF |
Rounding Profile |
CHAR |
4 |
0 |
|
RDPRF
|
|
BERW1 |
Stock Days' Supply Without Receipts |
DEC |
4 |
1 |
|
BERW1
|
|
BERW2 |
First Receipt Days' Supply |
DEC |
4 |
1 |
|
BERW2
|
|
KZAUS |
Discontinuation indicator |
CHAR |
1 |
0 |
|
KZAUS
|
1 |
Single/parallel discontinued part/material |
3 |
Dependent parallel discontinued part/material |
|
AUSDT |
Effective-Out Date |
DATS |
8 |
0 |
|
AUSDT
|
|
NFMAT |
Follow-Up Material |
CHAR |
40 |
0 |
|
NFMAT
|
|
AUSZ1 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ2 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ3 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ4 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ5 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ6 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ7 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
AUSZ8 |
Exception group in the MRP list |
CHAR |
2 |
0 |
|
AUSZX
|
|
BEADA |
MRP list processing date |
DATS |
8 |
0 |
|
BEADA
|
|
NAUKZ |
Indicator: new exception in the MRP list |
CHAR |
1 |
0 |
|
NAUKZ
|
|
SAUFT |
Indicator: Repetitive Manufacturing Allowed |
CHAR |
1 |
0 |
|
SA_SAUFT
|
|
KZPROMO |
Indicator: Material in promotion |
CHAR |
1 |
0 |
|
KZPROMO
|
|
SHFLG |
Safety time indicator (with or without safety time) |
CHAR |
1 |
0 |
|
SHFLG
|
|
Ignore safety time |
1 |
Safety time for independent reqmts |
2 |
Safety time for all requirements |
|
SHZET |
Safety Time (in Workdays) |
NUMC |
2 |
0 |
|
SHZET
|
|
FABKZ |
Indicator: Item Relevant to JIT Delivery Schedules |
CHAR |
1 |
0 |
|
FABKZ
|
|
MFXDT |
Manual firming date |
DATS |
8 |
0 |
|
MFXDT
|
|
BSKFL |
Flag whether stock correction factors exist |
CHAR |
1 |
0 |
|
BSKFL
|
|
MAABC |
ABC Indicator |
CHAR |
1 |
0 |
|
MAABC
|
|
CFLAG |
Aggregated MRP list |
CHAR |
1 |
0 |
|
COMPMRPL
|
|
GRREL |
Relevant for requirements grouping for project stock |
CHAR |
1 |
0 |
|
GRREL
|
|
RWPRO |
Range of coverage profile |
CHAR |
3 |
0 |
|
RWPRO
|
|
SHPRO |
Period Profile for Safety Time |
CHAR |
3 |
0 |
|
SHPRO
|
|
AHDIS |
MRP relevancy for dependent requirements |
CHAR |
1 |
0 |
|
AHDIS
|
|
Materials for dependent requirements are planned |
1 |
Materials for dependent requirements are not planned |
|
BERW4 |
Second Receipt Days' Supply |
DEC |
4 |
1 |
|
BERW4
|
|
BADON |
Indicator: BAdI is Active |
CHAR |
1 |
0 |
|
MD_BADI_ON
|
|
SGT_STATC |
Segmentation Status |
CHAR |
1 |
0 |
|
SGT_STATC
|
|
HANAON |
HANA Optimizations Active / Inactive |
CHAR |
1 |
0 |
|
PPH_HANA_ON
|
|