MANDT
Client
CLNT
3
0
T000
MANDT
DISPR
Material: MRP profile
CHAR
4
0
DISPR
DISMM
MRP Type
CHAR
2
0
T438A
DISMM
DISPO
MRP Controller
CHAR
3
0
T024D
DISPO
KZDIE
Indicator: MRP controller is buyer (deactivated)
CHAR
1
0
KZDIE
MAABC
ABC Indicator
CHAR
1
0
TMABC
MAABC
PLIFZ
Planned Delivery Time in Days
DEC
3
0
PLIFZ
DZEIT
In-house production time
DEC
3
0
DZEIT
FHORI
Scheduling Margin Key for Floats
CHAR
3
0
T436A
FHORI
SBDKZ
Dependent requirements ind. for individual and coll. reqmts
CHAR
1
0
SBDKZ
Possible values
Individual and collective requirements
1
Individual requirements only
2
Collective requirements only
KZBED
Indicator for Requirements Grouping
CHAR
1
0
KZBED
Possible values
0
In rep. mfg, individual record in addn to total requirements
T
Display of dependent requirements as a daily total
EISBE
Safety Stock
QUAN
13
3
EISBE
MINBE
Reorder Point
QUAN
13
3
MINBE
DISLS
Lot Sizing Procedure within Materials Planning
CHAR
2
0
T439A
DISLS
BSTRF
Rounding value for purchase order quantity
QUAN
13
3
BSTRF
BSTMI
Minimum Lot Size
QUAN
13
3
BSTMI
BSTMA
Maximum Lot Size
QUAN
13
3
BSTMA
BSTFE
Fixed lot size
QUAN
13
3
BSTFE
MABST
Maximum Stock Level
QUAN
13
3
MABST
AUSSS
Assembly scrap in percent
DEC
5
2
AUSSS
LOSFX
Lot-Size-Independent Costs
CURR
11
2
LOSFX
LAGPR
Storage Costs Percentage Code
CHAR
1
0
T439L
LAGPR
AUFTL
Splitting Indicator
CHAR
1
0
T439P
AUFTL
LGRAD
Service level
DEC
3
1
LGRAD
WEBAZ
Goods receipt processing time in days
DEC
3
0
WEBAZ
USEQU
Quota arrangement usage
CHAR
1
0
TMQ2
USEQU
PERKZ
Period Indicator
CHAR
1
0
PERKZ
Possible values
Initial value
M
Monthly
P
Period according to fiscal year variant
T
Daily
W
Weekly
PERIV
Fiscal Year Variant
CHAR
2
0
T009
PERIV
EKGRP
Purchasing Group
CHAR
3
0
T024
EKGRP
MRPPP
PPC Planning Calendar
CHAR
3
0
T439G
MRPPP
SAUFT
Indicator: Repetitive Manufacturing Allowed
CHAR
1
0
SA_SAUFT
SFEPR
Repetitive Manufacturing Profile
CHAR
4
0
T437S
SFEPR
FXHOR
Planning time fence
NUMC
3
0
FXHOR
VRMOD
Consumption mode
CHAR
1
0
VRMOD
Possible values
1
Backward consumption only
2
Backward/forward consumption
3
Forward consumption only
4
Forward/backward consumption
5
Period-specific consumption
VINT1
Consumption period: backward
NUMC
3
0
VINT1
VINT2
Consumption period: forward
NUMC
3
0
VINT2
DISGR
MRP Group
CHAR
4
0
T438M
DISGR
KAUSF
Component Scrap in Percent
DEC
5
2
KAUSF
ALTSL
Method for Selecting Alternative Bills of Material
CHAR
1
0
ALTSL
Possible values
Selection by order quant.
1
Selection by explosion date
2
Selection by production version
3
Selection only by production version
MISKZ
Mixed MRP indicator
CHAR
1
0
MISKZ
Possible values
1
Subassembly planning with final assembly
2
Gross requirements planning
3
Subassembly planning without final assembly
WZEIT
Total replenishment lead time (in workdays)
DEC
3
0
WZEIT
VPMAT
Planning material
CHAR
40
0
MARA
VPMAT
VPWRK
Planning plant
CHAR
4
0
MARC
VPWRK
VPREF
Conv. factor f. plng material
CHAR
10
0
VPREF
TAKZT
Takt time
DEC
3
0
TAKZT
RWPRO
Range of coverage profile
CHAR
3
0
T438R
RWPRO
LFRHY
Planning Cycle
CHAR
3
0
T439G
LFRHY
RDPRF
Rounding Profile
CHAR
4
0
RDPR
RDPRF
STRGR
Planning Strategy Group
CHAR
2
0
T461P
STRGR
SOBSL
Special procurement type
CHAR
2
0
T460A
SOBSL
RGEKZ
Indicator: Backflush
CHAR
1
0
RGEKM
Possible values
1
Always Backflush
2
Work center decides whether to backflush
SCHGT
Indicator: bulk material
CHAR
1
0
SCHGT
WAERS
Currency Key
CUKY
5
0
TCURC
WAERS
SHFLG
Safety time indicator (with or without safety time)
CHAR
1
0
SHFLG
Possible values
Ignore safety time
1
Safety time for independent reqmts
2
Safety time for all requirements
SHZET
Safety Time (in Workdays)
NUMC
2
0
SHZET
MDACH
Action Control: Planned Order Processing
CHAR
2
0
T46AC
MDACH
LGPRO
Issue Storage Location
CHAR
4
0
T001L
LGPRO
MTVFP
Checking Group for Availability Check
CHAR
2
0
TMVF
MTVFP
BESKZ
Procurement Type
CHAR
1
0
BESKZ
Possible values
No Procurement
E
In-House Production
F
External Procurement
X
Both Procurement Types
KZECH
Determination of batch entry in the production/process order
CHAR
1
0
KZECH
Possible values
Batch in goods issue; no confirmation required
1
Manual batch determination required upon release of order
2
Batch not required in prod./process order; confirmation reqd
3
Automatic batch determination upon release of order
EISLO
Minimum Safety Stock
QUAN
13
3
EISLO
PLIFZX
Consider Planned Delivery Time of the MRP Area
CHAR
1
0
MD_PLIFZ_DB
Possible values
Use Planned Delivery Time of the Plant
X
Use Planned Delivery Time of the MRP Area
LGFSB
Default storage location for external procurement
CHAR
4
0
T001L
LGFSB