SAP-tabelreferentie

T438M

Control Parameter for MRP -Material Level-

Bekijk een andere tabel

Vul een tabelcode of zoekwoord in om verder te zoeken.

Bekijk de structuur, velden en relaties van SAP-tabel T438M.

SAP-tabel T438M heeft 3 primaire sleutelvelden: MANDT,WERKS,MTART.

Bij analyse van data uit één SAP-instance is MANDT normaal overal gelijk en kun je dit veld weglaten uit relaties. Combineer je meerdere instances, neem MANDT dan wel op.

/ Velden

T438M velden.

42 velden
VeldOmschrijvingDatatypeLengteDecimalenChecktabelData-element
Sleutel MANDT ClientCLNT30 T000 MANDT
Sleutel WERKS PlantCHAR40 T001W WERKS_D
Sleutel MTART MRP GroupCHAR40 DISGR
BANER Creation Indicator for Purchase RequisitionsCHAR10 BANER
DISER Creation Indicator for MRP ListsCHAR10 DISER
UMTHZ Rescheduling horizonNUMC30 UMTHZ
FIXHZ Planning Time FenceNUMC30 FIXHZ
PLAHZ Planning horizonNUMC30 PLAHZ
SBDIS Share of safety stock which can be used for planningNUMC30 SBDIS
LIFKZ Automatic Schedule Lines (Scheduling Agreements)CHAR10 LIFKZ
GTERM Scheduling according to purchasing info record or agreementCHAR10 GTERM
KZDRB Indicator: direct procurement/production MRPCHAR10 KZDRB
XFAT1 Firm Only Schedule Lines Transmitted to Vendor by PurchasingCHAR10 XFAT1
XFAT2 Fant. 2CHAR10 XFAT2
VWVOR Tolerance value for bringing forward receipt elementsNUMC20 VWVOR
VWVER Tolerance value for displacement in the futureNUMC20 VWVER
PRREG Checking rule for the availability checkCHAR20 T441R PRREG
VRMOD Consumption modeCHAR10 VRMOD
VINT1 Consumption period: backwardNUMC30 VINT1
VINT2 Consumption period: forwardNUMC30 VINT2
STRGR Planning Strategy GroupCHAR20 T461P STRGR
RESHZ Roll forward period for the master planDEC20 RESHZ
ANDIS Number of Days After Which the Material Must Be PlannedINT250 ANDIS
AUART Order TypeCHAR40 T003O AUFART
AUAR2 Order type for process orderCHAR40 T003O AUAR2
PLSEL Issue Storage Location SelectionCHAR10 PLSEL
RVPKZ Adjustment of Planned Independent RequirementsCHAR10 RVPKZ
RESVP Period of adjustment for planned independent requirementsDEC30 RESVP
SHFLG Safety time indicator (with or without safety time)CHAR10 SHFLG
SHZET Safety Time (in Workdays)NUMC20 SHZET
MDACH Action Control: Planned Order ProcessingCHAR20 T46AC MDACH
PRASTA Period splitCHAR50 T459S PRASTA
EXSGT Do not explode bulk material itemsCHAR10 EXSGD
BESAL Determination of explosion date for BOM and routingCHAR10 BESAD
BSART MRP:doc.type purchase requisitions for standard purchase ordCHAR40 T161 BBSRT_NB
BARTL MRP: Document type purchase requisition for subcontractingCHAR40 T161 BBSRT_LB
BARTU MRP: purchase requisition for stock transfer - document typeCHAR40 T161 BBSRT_UL
GRREL Relevant for requirements grouping for project stockCHAR10 GRREL
VERTR Start date of order proposals allowed in the pastCHAR10 VERGR
FKOBS ATP check by full confirmation logicCHAR10 FKOBS
EVAPR Evaluation Profile for Range-of-Coverage DataCHAR30 T465 MD_EVAPR
PREQAPPROVAL Purchase Requisition Handover to Purchasing RequiredCHAR10 PREQAPPROVAL
/ Relaties

T438M relaties.

17 relaties
TabelVeldChecktabelOmschrijvingCheckveld
T438MAUAR2T003OOrder TypesAUART
T438MAUARTT003OOrder TypesAUART
T438MBARTLT161Purchasing Document TypesMANDT
T438MBARTUT161Purchasing Document TypesMANDT
T438MBSARTT161Purchasing Document TypesMANDT
T438MEVAPRT465Evaluation Profile Ranges of CoverageMANDT
T438MEVAPRT465Evaluation Profile Ranges of CoverageEVAPR
T438MMDACHT46ACAction controlMANDT
T438MMDACHT46ACAction controlMDACH
T438MMDACHT46ACAction controlACCFM
T438MMDACHT46ACAction controlACCTO
T438MPRASTAT459SPeriod splittingMANDT
T438MPRREGT441RValues Table for Checking RuleMANDT
T438MPRREGT441RValues Table for Checking RulePRREG
T438MSTRGRT461PPlanning strategy groupMANDT
T438MSTRGRT461PPlanning strategy groupSTRGR
T438MWERKST001WPlants/BranchesWERKS