MANDT
Client
CLNT
3
0
T000
MANDT
AUFNR
Order Number
CHAR
12
0
AUFK
AUFNR
GLTRP
Basic finish date
DATS
8
0
CO_GLTRP
GSTRP
Basic Start Date
DATS
8
0
PM_ORDGSTRP
FTRMS
Scheduled release date
DATS
8
0
CO_FTRMS
GLTRS
Scheduled finish
DATS
8
0
CO_GLTRS
GSTRS
Scheduled start
DATS
8
0
CO_GSTRS
GSTRI
Actual start date
DATS
8
0
CO_GSTRI
GETRI
Confirmed Order Finish Date
DATS
8
0
CO_GETRI
GLTRI
Actual finish date
DATS
8
0
CO_GLTRI
FTRMI
Actual release date
DATS
8
0
CO_FTRMI
FTRMP
Planned Release Date
DATS
8
0
CO_FTRMP
RSNUM
Number of reservation/dependent requirements
NUMC
10
0
*
RSNUM
GASMG
Total Scrap Quantity in the Order
QUAN
13
3
GASMG
GAMNG
Total Order Quantity
QUAN
13
3
GAMNG
GMEIN
Base Unit of Measure
UNIT
3
0
T006
MEINS
PLNBEZ
Material Number
CHAR
40
0
MARA
MATNR
PLNTY
Task List Type
CHAR
1
0
PLNTY
PLNNR
Key for Task List Group
CHAR
8
0
PLNNR
PLNAW
Application of the task list
CHAR
1
0
TCA09
PLNAW
PLNAL
Group Counter
CHAR
2
0
PLNAL
PVERW
Task List Usage
CHAR
3
0
T411
PLN_VERWE
PLAUF
Date for Routing Explosion
DATS
8
0
CO_PLAUF
PLSVB
Maximum Lot Size
QUAN
13
3
LOSGRBIS
PLNME
Task List Unit of Measure
UNIT
3
0
T006
PLNME
PLSVN
Minimum Lot Size
QUAN
13
3
LOSGRVON
PDATV
Valid-From Date
DATS
8
0
DATUV
PAENR
Change Number
CHAR
12
0
AENR
AENNR
PLGRP
Responsible Planner Group or Department
CHAR
3
0
T024A
VAGRP
LODIV
Lot size divisor (not used)
QUAN
13
3
LOSDIV
STLTY
BOM category
CHAR
1
0
STLTY
Possible values
D
Document Structure
E
Equipment BOM
K
Order BOM
M
Material BOM
P
Work Breakdown Structure BOM
S
Standard BOM
T
Functional Location BOM
STLBEZ
Material Number
CHAR
40
0
MARA
MATNR
STLST
Bill of Material Status
NUMC
2
0
T415S
STLST
STLNR
Bill of Material
CHAR
8
0
STNUM
SDATV
Valid-From Date
DATS
8
0
DATUV
SBMNG
Base quantity
QUAN
13
3
BASMN
SBMEH
Base Unit of Measure
UNIT
3
0
T006
MEINS
SAENR
Change Number
CHAR
12
0
AENR
AENNR
STLAL
Alternative BOM
CHAR
2
0
STALT
STLAN
BOM Usage
CHAR
1
0
T416
STLAN
SLSVN
From Lot Size
QUAN
13
3
LOSVN
SLSBS
To Lot Size
QUAN
13
3
LOSBS
AUFLD
Date of BOM Explosion/Routing Transfer
DATS
8
0
CO_AUFLD
DISPO
MRP controller for the order
CHAR
3
0
T024D
CO_DISPO
AUFPL
Routing number of operations in the order
NUMC
10
0
CO_AUFPL
FEVOR
Production Supervisor
CHAR
3
0
T024F
FEVOR
FHORI
Scheduling Margin Key for Floats
CHAR
3
0
T436A
FHORI
TERKZ
Scheduling type
CHAR
1
0
T482
TERMKZ
REDKZ
Reduction indicator for scheduling
CHAR
1
0
REDKZ
Possible values
No reduction carried out
1
Reduction level 1
2
Reduction level 2
3
Reduction level 3
4
Reduction level 4
5
Reduction level 5
6
Reduction level 6
APRIO
Order priority
CHAR
1
0
CO_APRIO
NTZUE
Superior network number
CHAR
12
0
AUFK
NETZ_UEBER
VORUE
Superior activity
CHAR
4
0
VORG_UEBER
PROFID
Network Profile
CHAR
7
0
TCN41
PROFIDNZPL
VORGZ
Float before production (in days)
NUMC
3
0
VORGZ
SICHZ
Float after production (in days)
NUMC
3
0
SICHZ
FREIZ
Release period (in days)
NUMC
3
0
FREIZ
UPTER
Indicator: Change to Scheduled Dates
CHAR
1
0
CO_UPTER
BEDID
ID of the Capacity Requirements Record
NUMC
12
0
*
BEDID
PRONR
Project definition
NUMC
8
0
PROJ
PS_PSP_PRO
ZAEHL
Internal counter
NUMC
8
0
CIM_COUNT
MZAEHL
Internal counter
NUMC
8
0
CIM_COUNT
ZKRIZ
Counter for Additional Criteria
NUMC
7
0
DZKRIZ
PRUEFLOS
Inspection Lot Number
NUMC
12
0
QPLOS
KLVARP
Costing Variant for Planned Costs
CHAR
4
0
*
KALKVARPLN
KLVARI
Costing Variant For Actual Costs
CHAR
4
0
*
KALKVARIST
RGEKZ
Indicator: Backflushing for order
CHAR
1
0
CO_RGEKZ
Possible values
1
Backflush components during goods receipt
2
Backflush all components during goods receipt
PLART
Basis for scheduling
CHAR
1
0
PS_PLART
Possible values
1
Basic dates
2
Forecast dates
FLG_AOB
Indicator: relationships
CHAR
1
0
FLG_AOB
FLG_ARBEI
Indicator: Default value work is relevant
CHAR
1
0
FLG_ARBEI
GLTPP
Finish date (forecast)
DATS
8
0
CO_GLTPP
GSTPP
Forecast start date
DATS
8
0
CO_GSTPP
GLTPS
Scheduled forecast finish
DATS
8
0
CO_GLTPS
GSTPS
Scheduled forecast start
DATS
8
0
CO_GSTPS
FTRPS
Scheduled release date (forecast)
DATS
8
0
CO_FTRPS
RDKZP
Reduction indicator for scheduling (forecast)
CHAR
1
0
REDKZP
TRKZP
Scheduling type (forecast)
CHAR
1
0
*
TERMKZP
RUECK
Completion confirmation number for the operation
NUMC
10
0
CO_RUECK
RMZHL
Internal counter
NUMC
8
0
CIM_COUNT
IGMNG
Confirmed Yield Quantity From Order Confirmation
QUAN
13
3
CO_IGMNG
RATID
-INVALID FOR S/4- Index for the rslts of schedg prod. rates
NUMC
12
0
*
RATID
GROID
-INVALID FOR S/4- Index for rough scheduling results
NUMC
12
0
*
GROID
CUOBJ
Configuration (internal object number)
NUMC
18
0
CUOBJ
GLUZS
Scheduled finish time
TIMS
6
0
CO_GLUZS
GSUZS
Scheduled Start (Time)
TIMS
6
0
CO_GSUZS
REVLV
Revision Level
CHAR
2
0
REVLV
RSHTY
Object types of the CIM resource
CHAR
2
0
CR_OBJTY
Possible values
A
Work Center
AA
Work center alias
FH
Production resources/tools
G
Group
H
Hierarchy
RSHID
Object ID of the resource
NUMC
8
0
CRID
CR_OBJID
RSNTY
Object types of the CIM resource
CHAR
2
0
CR_OBJTY
Possible values
A
Work Center
AA
Work center alias
FH
Production resources/tools
G
Group
H
Hierarchy
RSNID
Object ID of the resource
NUMC
8
0
CRID
CR_OBJID
NAUTERM
Indicator: Do not schedule automatically
CHAR
1
0
CO_NAUTERM
NAUCOST
Indicator: Do not cost automatically
CHAR
1
0
CO_NAUCOST
STUFE
Level (in multi-level BOM explosions)
DEC
2
0
HISTU
WEGXX
Path (for multi-level BOM explosions)
DEC
4
0
WEGXX
VWEGX
Path (for multi-level BOM explosions)
DEC
4
0
WEGXX
ARSNR
Number of reservation/dependent requirements
NUMC
10
0
*
RSNUM
ARSPS
Order item number
NUMC
4
0
CO_POSNR
MAUFNR
Number of Superior Order
CHAR
12
0
*
MAUFNR
LKNOT
Left node in collective order
CHAR
12
0
*
CO_LKNOT
RKNOT
Right node of a collective order
CHAR
12
0
*
CO_RKNOT
PRODNET
Order is Part of Collective Order
CHAR
1
0
CO_PRODNET
IASMG
Confirmed Scrap Quantity From Order Confirmation
QUAN
13
3
CO_IASMG
ABARB
Confirmation: Degree of processing
NUMC
3
0
CO_ABARB
AUFNT
Number of superior network
CHAR
12
0
*
CO_TEILNET
AUFPT
Routing number of operations in the order
NUMC
10
0
CO_AUFPL
APLZT
General counter for order
NUMC
8
0
*
CO_APLZL
NO_DISP
Effective for Materials Planning
CHAR
1
0
NO_DISP_PLUS
Possible values
Relevant to materials planning
1
Not relevant to materials planning
B
Immediately with blocking indicator
X
Relevant to materials planning at a defined time
CSPLIT
Apportionment Structure
CHAR
4
0
MAKV
CSPLIT
AENNR
Change Number
CHAR
12
0
AENR
AENNR
CY_SEQNR
Sequence Number Order
NUMC
14
0
CY_SEQNR
BREAKS
Indicator: Scheduling allowing for breaks
CHAR
1
0
BREAKS
VORGZ_TRM
Scheduled float before production in days
DEC
6
3
VORGZ_TRM
SICHZ_TRM
Scheduled float after production in days
DEC
6
3
SICHZ_TRM
TRMDT
Date of the Last Scheduling
DATS
8
0
TRMDT
GLUZP
Basic Finish (Time)
TIMS
6
0
CO_GLUZP
GSUZP
Basic Start (Time)
TIMS
6
0
CO_GSUZP
GSUZI
Actual start time
TIMS
6
0
CO_GSUZI
GEUZI
Confirmed Order Finish (Time)
TIMS
6
0
CO_GEUZI
GLUPP
Forecast finish (time)
TIMS
6
0
CO_GLUPP
GSUPP
Forecast start (time)
TIMS
6
0
CO_GSUPP
GLUPS
Scheduled forecast finish time
TIMS
6
0
CO_GLUPS
GSUPS
Scheduled start time (Forecast)
TIMS
6
0
CO_GSUPS
CHSCH
Search Procedure for Batch Determination
CHAR
6
0
T683
KALSMA_CH
KAPT_VORGZ
Float (bef. production) remaining after finite scheduling
NUMC
3
0
KAPT_VORGZ
KAPT_SICHZ
Remaining float after finite scheduling
NUMC
3
0
KAPT_SICHZ
LEAD_AUFNR
Leading Order in Current Processing
CHAR
12
0
AUFK
CO_LAUFNR
PNETSTARTD
Outline start of collective network (date)
DATS
8
0
CO_PSTARTD
PNETSTARTT
Start time of a collective order
TIMS
6
0
CO_PSTARTT
PNETENDD
Outline finish of collective order (date)
DATS
8
0
CO_PENDD
PNETENDT
Outline finish time
TIMS
6
0
CO_PENDT
KBED
Indicator: Do not Create Capacity Requirements
CHAR
1
0
KBED_D
KKALKR
Indicator: Components will not be costed
CHAR
1
0
COMP_CALC
SFCPF
Production Scheduling Profile
CHAR
6
0
TCO43
CO_PRODPRF
RMNGA
Total Confirmed Rework Quantity
QUAN
13
3
RMNGA
GSBTR
Total Commitment Date
DATS
8
0
CO_GSBTR
VFMNG
Committed quantity for order acc. to ATP check components
QUAN
13
3
CO_VFMNG
NOPCOST
Do not calculate planned costs for order
CHAR
1
0
CO_NOPCOST
NETZKONT
Indicator for the account assignment of a network(hdr/act.)
CHAR
1
0
NETZKONT
Possible values
Account assignment determined by status
1
Header-assigned network
2
Activity-assigned network
ATRKZ
Request ID
CHAR
1
0
ATRKZ
Possible values
Standard request
B
TOI - Order (created using BAPI)
E
MOP - Order (previously EOG)
L
LPP - Order
M
Multi-Item Order
T
Segmentation Order
U
Original Order
Z
Combined Order
OBJTYPE
Change indicator
CHAR
1
0
OCM_OBJ_TYPE
Possible values
Normal object
+
Object created
-
Object is to be deleted
0
Zero Object
C
Object changed
M
Object reassigned
CH_PROC
Process that has lead to the change of an object
CHAR
1
0
OCM_CH_PROC
Possible values
Not changed
1
Manually changed
2
Change sales order
3
Release of change number
4
Change assembly order
5
Change number supplement
6
Change number shift
7
Direct assignment
KAPVERSA
Version of Available Capacity
NUMC
2
0
*
KAPVERSA
COLORDPROC
Collective order with/without automatic goods movement
CHAR
1
0
CO_COLORDPRC
Possible values
Collective order without automatic goods movement
X
Collective order with automatic goods movement
KZERB
Indicator: Project summarization via master data charact.
CHAR
1
0
PS_KZERB
CONF_KEY
Identical object
NUMC
8
0
CC_CONF_KEY
ST_ARBID
Object ID
NUMC
8
0
OBJEKTID
VSNMR_V
Sales document version number
CHAR
12
0
VSNMR_V
TERHW
Scheduling note from order scheduling
CHAR
1
0
TERHW
Possible values
No scheduling note
1
Basic finish date is before scheduled finish
2
Automatically carried out today scheduling
SPLSTAT
Status of an Order in a Split Hierarchy
CHAR
1
0
SPLIT_STAT
Possible values
not split, not created by splitting
1
split
2
created by splitting
3
created by splitting and split
COSTUPD
Costs are updated
CHAR
1
0
CN_COSTUPD
MAX_GAMNG
Maximum Value of Total Order Quantity After Distribution
QUAN
13
3
CO_MES_MAX_GAMNG
MES_ROUTINGID
Key of a Routing from an ME System
CHAR
64
0
CO_MES_INT_ROUTINGID
TL_VERSN
Routing Version
CHAR
4
0
PLNVERSN
BOM_VERSN
BOM Version
CHAR
4
0
CS_VERSN
FLEXIBLE_PROCESSING
Flexible Processing
CHAR
1
0
MPE_FLEXIBLE_PROCESSING
ADPSP
PM/PS Reference Element
CHAR
40
0
ADCOMPARE
RMANR
Sales and Distribution Document Number
CHAR
10
0
VBELN
POSNR_RMA
Item number of the SD document
NUMC
6
0
POSNR
POSNV_RMA
Item number of the SD document
NUMC
6
0
POSNR
CFB_MAXLZ
Maximum Storage Period
DEC
5
0
MAXLZ
CFB_LZEIH
Unit for maximum storage period
UNIT
3
0
T006
LZEIH
CFB_ADTDAYS
Additional Days
DEC
4
0
CFB_ADTDAYS
CFB_DATOFM
Date of Manufacture
DATS
8
0
CFB_DATOFM
CFB_BBDPI
Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED)
DATS
8
0
CFB_BBD_PPPI
OIHANTYP
Excise Duty Handling Type
CHAR
2
0
OIH_HANTYP
FSH_MPROD_ORD
Master Production Order Number
CHAR
12
0
FSH_MPROD
FSH_MPROD_ORD
FLG_BUNDLE
Indicates Bundle Information Maintained
CHAR
1
0
FLG_BUNDLE
MILL_RATIO
Factor for Quantity-Based Settlement
INT4
10
0
MILL_RATIO
BMEINS
Base Unit of Measure
UNIT
3
0
*
MEINS
BMENGE
Base quantity
QUAN
13
3
BASMN
MILL_OC_ZUSKZ
Combination Indicator
CHAR
1
0
MILL_OC_ZUSKZ
Possible values
H
Combination by Order
O
Combination by Operation