T439A
MRP Lot SizesExplore another table
Enter a table code or keyword to continue exploring.
Explore the structure, fields and relationships of SAP table T439A.
SAP table T439A has 2 primary key fields: MANDT,DISLS.
When analysing data from one SAP instance, MANDT is normally identical across the dataset and may be omitted from relationships. When combining multiple instances, include MANDT.
T439A fields.
| Field | Description | Data type | Length | Decimals | Check table | Data element | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Key MANDT | Client | CLNT | 3 | 0 | MANDT | ||||||||||||||||||||||||
| Key DISLS | Lot Sizing Procedure within Materials Planning | CHAR | 2 | 0 | DISLS | ||||||||||||||||||||||||
| LOSVF | Lot-sizing procedure for short-term period | CHAR | 1 | 0 | LOSVF | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| LOSKZ | Lot-size indicator for the short-term period | CHAR | 1 | 0 | LOSKZ | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| PERAZ | Number of Periods for the Short-Term Area | DEC | 3 | 0 | PERAZ | ||||||||||||||||||||||||
| TERBV | Scheduling for period lot sizes in short-term area | CHAR | 1 | 0 | TERBV | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| UELAP | Overlap scheduling in the short-term area | CHAR | 1 | 0 | UELAP | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| KFPKZ | Period indicator for calculating long-term planning | CHAR | 1 | 0 | KFPKZ | ||||||||||||||||||||||||
| KFPAZ | Number of periods for long-term lot size | DEC | 3 | 0 | KFPAZ | ||||||||||||||||||||||||
| LGLVF | Lot-sizing procedure for long-term lot-sizing | CHAR | 1 | 0 | LGLVF | ||||||||||||||||||||||||
| LGLKZ | Lot-size indicator for long-term lot-sizing procedure | CHAR | 1 | 0 | LGLKZ | ||||||||||||||||||||||||
| LGPAZ | Number of periods for long-term lot size | DEC | 3 | 0 | LGPAZ | ||||||||||||||||||||||||
| LGTER | Scheduling the long-term period lot-sizing procedure | CHAR | 1 | 0 | LGTER | ||||||||||||||||||||||||
| LGUEL | Overlapping indiactor for long-term lot sizing | CHAR | 1 | 0 | LGUEL | ||||||||||||||||||||||||
| LGMIN | Check minimum lot size | CHAR | 1 | 0 | CHMIN | ||||||||||||||||||||||||
| LGMAX | Check maximum lot size | CHAR | 1 | 0 | CHMAX | ||||||||||||||||||||||||
| KZSPL | Indicator: Splitting quota in short-term horizon | CHAR | 1 | 0 | KZSPL | ||||||||||||||||||||||||
| LGSPL | Indicator: splitting quota in the long-term horizon | CHAR | 1 | 0 | LGSPL | ||||||||||||||||||||||||
| INTKA | Interpretation of the planning calendar events | CHAR | 1 | 0 | INTKA | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| LGINT | Iterpretation of MRP dates: long-term planning | CHAR | 1 | 0 | LGINT | ||||||||||||||||||||||||
| LGKND | Lot-size calculation in make-to-order production | CHAR | 1 | 0 | LGKND | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| KZHOR | Horizon for lot-for-lot order qty | NUMC | 3 | 0 | KZHOR | ||||||||||||||||||||||||
| HBVAR | Maximum stock level variant | CHAR | 1 | 0 | HBVAR | ||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| LASTL | Last lot exact | CHAR | 1 | 0 | LASTL | ||||||||||||||||||||||||
| UNTKZ | Underdelivery Tolerance | CHAR | 1 | 0 | UNTKZ | ||||||||||||||||||||||||