Key MANDT
Client CLNT 3 0
T000
MANDT
Key WERKS
Plant CHAR 4 0
T001W
WERKS_D
Key MTART
MRP Group CHAR 4 0
DISGR
BANER
Creation Indicator for Purchase Requisitions CHAR 1 0
BANER
Possible values
1 Purchase requisitions 2 Purchase requisitions in opening period 3 Planned orders
DISER
Creation Indicator for MRP Lists CHAR 1 0
DISER
Possible values
1 MRP list 2 Depending on the exception messages 3 No MRP list
UMTHZ
Rescheduling horizon NUMC 3 0
UMTHZ
FIXHZ
Planning Time Fence NUMC 3 0
FIXHZ
PLAHZ
Planning horizon NUMC 3 0
PLAHZ
SBDIS
Share of safety stock which can be used for planning NUMC 3 0
SBDIS
LIFKZ
Automatic Schedule Lines (Scheduling Agreements) CHAR 1 0
LIFKZ
Possible values
1 No schedule lines 2 Schedule lines in the opening period 3 Schedule lines
GTERM
Scheduling according to purchasing info record or agreement CHAR 1 0
GTERM
KZDRB
Indicator: direct procurement/production MRP CHAR 1 0
KZDRB
Possible values
Direct procurement only when creating production order 1 Trigger direct procurement in requirements planning 2 Direct procurement only when creating production order 3 Trigger direct procurement in requirements planning
XFAT1
Firm Only Schedule Lines Transmitted to Vendor by Purchasing CHAR 1 0
XFAT1
XFAT2
Fant. 2 CHAR 1 0
XFAT2
VWVOR
Tolerance value for bringing forward receipt elements NUMC 2 0
VWVOR
VWVER
Tolerance value for displacement in the future NUMC 2 0
VWVER
PRREG
Checking rule for the availability check CHAR 2 0
T441R
PRREG
VRMOD
Consumption mode CHAR 1 0
VRMOD
Possible values
1 Backward consumption only 2 Backward/forward consumption 3 Forward consumption only 4 Forward/backward consumption 5 Period-specific consumption
VINT1
Consumption period: backward NUMC 3 0
VINT1
VINT2
Consumption period: forward NUMC 3 0
VINT2
STRGR
Planning Strategy Group CHAR 2 0
T461P
STRGR
RESHZ
Roll forward period for the master plan DEC 2 0
RESHZ
ANDIS
Number of Days After Which the Material Must Be Planned INT2 5 0
ANDIS
AUART
Order Type CHAR 4 0
T003O
AUFART
AUAR2
Order type for process order CHAR 4 0
T003O
AUAR2
PLSEL
Issue Storage Location Selection CHAR 1 0
PLSEL
Possible values
1 Only components 2 Only assemblies 3 1st components / 2nd assemblies 4 1st assemblies / 2nd components
RVPKZ
Adjustment of Planned Independent Requirements CHAR 1 0
RVPKZ
Possible values
No adjustment 1 Adjustment in the future 2 Adjustment in the past 3 Adjustment in the future - only indep.reqmts w. consumption 4 Adjustment in the past - only indep. reqmts w. consumption
RESVP
Period of adjustment for planned independent requirements DEC 3 0
RESVP
SHFLG
Safety time indicator (with or without safety time) CHAR 1 0
SHFLG
Possible values
Ignore safety time 1 Safety time for independent reqmts 2 Safety time for all requirements
SHZET
Safety Time (in Workdays) NUMC 2 0
SHZET
MDACH
Action Control: Planned Order Processing CHAR 2 0
T46AC
MDACH
PRASTA
Period split CHAR 5 0
T459S
PRASTA
EXSGT
Do not explode bulk material items CHAR 1 0
EXSGD
Possible values
Setting from plant parameter 1 Generation of dependent requirements 2 No generation of dependent requirements
BESAL
Determination of explosion date for BOM and routing CHAR 1 0
BESAD
Possible values
Setting from plant parameter 1 Basic start date 2 Basic finish date 3 BOM explosion number/order start date 4 BOM explosion number/order finish date
BSART
MRP:doc.type purchase requisitions for standard purchase ord CHAR 4 0
T161
BBSRT_NB
BARTL
MRP: Document type purchase requisition for subcontracting CHAR 4 0
T161
BBSRT_LB
BARTU
MRP: purchase requisition for stock transfer - document type CHAR 4 0
T161
BBSRT_UL
GRREL
Relevant for requirements grouping for project stock CHAR 1 0
GRREL
VERTR
Start date of order proposals allowed in the past CHAR 1 0
VERGR
Possible values
Control at plant level 1 Start date in past allowed 2 Start date in past not allowed
FKOBS
ATP check by full confirmation logic CHAR 1 0
FKOBS
EVAPR
Evaluation Profile for Range-of-Coverage Data CHAR 3 0
T465
MD_EVAPR
PREQAPPROVAL
Purchase Requisition Handover to Purchasing Required CHAR 1 0
PREQAPPROVAL