MANDT
Client
CLNT
3
0
T000
MANDT
AUFNR
Order Number
CHAR
12
0
AUFNR
AUART
Order Type
CHAR
4
0
T003O
AUFART
AUTYP
Order category
NUMC
2
0
AUFTYP
Possible values
01
Internal Order (Controlling)
02
Accrual Calculation Order (Controlling)
03
Model Order (Controlling)
04
CO Production Order
05
Product Cost Collector
06
QM Order
10
PP Production Order
20
Network
30
Maintenance order
40
Process Order
50
Inspection Lot
60
Personnel Order
70
Shipping deadlines
99
Master Planned order
REFNR
Reference Order Number
CHAR
12
0
AUFK
AUFREFNR
ERNAM
Entered By
CHAR
12
0
AUFERFNAM
ERDAT
Created On
DATS
8
0
AUFERFDAT
AENAM
Last Changed By
CHAR
12
0
AUFAENAM
AEDAT
Change Date for Order Master
DATS
8
0
AUFAEDAT
KTEXT
Description
CHAR
40
0
AUFTEXT
LTEXT
Long Text Exists
CHAR
1
0
AUFLTEXT
BUKRS
Company Code
CHAR
4
0
T001
BUKRS
WERKS
Plant
CHAR
4
0
T001W
WERKS_D
GSBER
Business Area
CHAR
4
0
TGSB
GSBER
KOKRS
Controlling Area
CHAR
4
0
TKA01
KOKRS
CCKEY
Cost Collector Key
CHAR
23
0
CCKEY
KOSTV
Responsible cost center
CHAR
10
0
CSKS
AUFKOSTV
STORT
Location
CHAR
10
0
T499S
AUFSTORT
SOWRK
Location Plant
CHAR
4
0
T001W
AUFSOWRK
ASTKZ
Identifier for Statistical Order
CHAR
1
0
AUFSTKZ
WAERS
Order Currency
CUKY
5
0
TCURC
AUFWAERS
STDAT
Date of Last Status Change
DATS
8
0
AUFSTDAT
IDAT1
Release Date
DATS
8
0
AUFIDAT1
IDAT2
Technical Completion Date
DATS
8
0
AUFIDAT2
IDAT3
Close Date
DATS
8
0
AUFIDAT3
OBJID
Object ID
CHAR
1
0
CCOBJID
LOEKZ
Deletion Flag
CHAR
1
0
AUFLOEKZ
PLGKZ
Identifier for Planning with Line Items
CHAR
1
0
PLGKZ
KVEWE
Usage of the condition table
CHAR
1
0
T681V
KVEWE
KAPPL
Application
CHAR
2
0
T681A
KAPPL
KALSM
Costing Sheet
CHAR
6
0
T683
AUFKALSM
ZSCHL
Overhead key
CHAR
6
0
AUFZSCHL
ABKRS
Processing group
NUMC
2
0
TKO08
AUFABKRS
KSTAR
Settlement Cost Element
CHAR
10
0
CSKB
AUFKSTAR
KOSTL
Cost Center for Basic Settlement
CHAR
10
0
CSKS
AUFKOSTL
SETNM
Allocation Set
CHAR
12
0
AUFSETNM
CYCLE
Cost center to which costs are actually posted
CHAR
10
0
CSKS
ST_KOSTL
SDATE
Start Date
DATS
8
0
SDATE
SEQNR
Sequence Number
NUMC
4
0
AUFSEQNR
USER4
Estimated total costs of order
CURR
11
2
AUFUSER4
OBJNR
Object number
CHAR
22
0
ONR00
J_OBJNR
PRCTR
Profit Center
CHAR
10
0
CEPC
PRCTR
PSPEL
Work breakdown structure element (WBS element)
NUMC
8
0
PRPS
PS_PSP_ELE
AWSLS
Variance Key
CHAR
6
0
TKV01
AWSLS
ABGSL
Results Analysis Key
CHAR
6
0
TKKAA
ABGR_SCHL
EB_POST
Event-Based Posting
CHAR
1
0
FCO_EB_POST
Possible values
Non-Event-Based Posting
M
Migrated Non-Event-Based Posting
X
Event-Based Posting
TXJCD
Tax Jurisdiction
CHAR
15
0
TTXJ
TXJCD
FUNC_AREA
Functional Area
CHAR
16
0
TFKB
FKBER
SCOPE
Object Class
CHAR
2
0
SCOPE_CV
Possible values
IV
Investment
OC
Overhead costs
PA
Profit analysis
PR
Production
PLINT
Indicator for Integrated Planning
CHAR
1
0
PLINT
KDAUF
Sales Order Number
CHAR
10
0
KDAUF
KDPOS
Item number in Sales Order
NUMC
6
0
KDPOS
AUFEX
External order number
CHAR
20
0
AUFEX
IVPRO
Investment Measure Profile
CHAR
6
0
TAPRF
IM_PROFIL
LOGSYSTEM
Logical System
CHAR
10
0
TBDLS
LOGSYSTEM
FLG_MLTPS
Order Has Multiple Items
CHAR
1
0
CO_MLTPS
ABUKR
Requesting company code
CHAR
4
0
T001
IM_ABUKRS
AKSTL
Requesting cost center
CHAR
10
0
CSKS
PS_AKSTL
SIZECL
Scale of investment objects
CHAR
2
0
TAIF5
IM_SIZECL
IZWEK
Reason for Investment
CHAR
2
0
T087I
IZWEK
UMWKZ
Reason for Environmental Investment
CHAR
5
0
T087K
AM_UMWKZ
KSTEMPF
Indicator: Direct cost collector
CHAR
1
0
CO_KSTEMPF
Possible values
E
Sales order
K
Cost center
P
Project
ZSCHM
Interest Profile for Project/Order Interest Calculation
CHAR
7
0
TPI01
PS_ZSCHM
PKOSA
Cost Collector for Production Process
CHAR
12
0
PKOSA_D
ANFAUFNR
Requesting order
CHAR
12
0
AUFK
AUFANFNR
PROCNR
Production Process
NUMC
12
0
CKML_F_PROCNR
PROTY
Process Category (Procurement/Consumption)
CHAR
4
0
CKML_PROZESS_TYP
RSORD
Refurbishment order indicator (PM)
CHAR
1
0
RSORD
BEMOT
Accounting Indicator
CHAR
2
0
TBMOT
BEMOT
ADRNRA
Address Number
CHAR
10
0
AD_ADDRNUM
ERFZEIT
Time created
TIMS
6
0
CO_INS_TIME
AEZEIT
Changed At
TIMS
6
0
CO_CHG_TIME
CSTG_VRNT
Costing Variant
CHAR
4
0
CK_KLVAR
COSTESTNR
Cost Estimate Number for Cost Est. w/o Qty Structure
NUMC
12
0
CK_KALNR
VERAA_USER
Person Responsible for CO Internal Order
CHAR
12
0
USR02
VERAA_USER
EEW_AUFK_PS_DUMMY
Dummy function in length 1
CHAR
1
0
DUMMY
VNAME
Joint venture
CHAR
6
0
T8JV
JV_NAME
RECID
Recovery Indicator
CHAR
2
0
T8JJ
JV_RECIND
ETYPE
Equity type
CHAR
3
0
T8JG
JV_ETYPE
OTYPE
Joint Venture Object Type
CHAR
4
0
JV_OTYPE
JV_JIBCL
JIB/JIBE Class
CHAR
3
0
T8J6A
JV_JIBCL
JV_JIBSA
JIB/JIBE Subclass A
CHAR
5
0
T8J6C
JV_JIBSA
JV_OCO
JV original cost object
CHAR
1
0
JV_OR_CO
CPD_UPDAT
Time Stamp
DEC
15
0
/CPD/PFP_SC_TSTMP
/CUM/INDCU
CU: Order is Used for Compatible Units
CHAR
1
0
/CUM/INDCU
/CUM/CMNUM
CU: Construction Measure Number
CHAR
12
0
/CUM/CMNUM
/CUM/AUEST
CU: Automatic Copy of Estimated Costs
CHAR
1
0
/CUM/AUEST
/CUM/DESNUM
CU: Design Number
CHAR
12
0
/CUM/DESNUM
AD01PROFNR
Dynamic Item Processor Profile
CHAR
8
0
AD01C_PROF
AD01PROFNR
VAPLZ
Main work center for maintenance tasks
CHAR
8
0
GEWRK
WAWRK
Plant associated with main work center
CHAR
4
0
WERGW
FERC_IND
Regulatory indicator
CHAR
4
0
FERC_C7
FE_IND
CLAIM_CONTROL
Claim creation control indicator
CHAR
1
0
WTYSCC_CLM_CONT
WTYSC_CLAIM_CONTROL
UPDATE_NEEDED
Claim inconsistency with order indicator
CHAR
1
0
WTYSC_UPDATE_NEEDED
Possible values
UPDATE_CONTROL
Claim update trigger point from service order
CHAR
1
0
WTYSCC_UPDT_CONT
WTYSC_UPDATE_CONTROL
GLTRP
Basic finish date
DATS
8
0
CO_GLTRP
GSTRP
Basic Start Date
DATS
8
0
PM_ORDGSTRP
FTRMS
Scheduled release date
DATS
8
0
CO_FTRMS
GLTRS
Scheduled finish
DATS
8
0
CO_GLTRS
GSTRS
Scheduled start
DATS
8
0
CO_GSTRS
GSTRI
Actual start date
DATS
8
0
CO_GSTRI
GETRI
Confirmed Order Finish Date
DATS
8
0
CO_GETRI
GLTRI
Actual finish date
DATS
8
0
CO_GLTRI
FTRMI
Actual release date
DATS
8
0
CO_FTRMI
FTRMP
Planned Release Date
DATS
8
0
CO_FTRMP
RSNUM
Number of reservation/dependent requirements
NUMC
10
0
RSNUM
GASMG
Total Scrap Quantity in the Order
QUAN
13
3
GASMG
GAMNG
Total Order Quantity
QUAN
13
3
GAMNG
GMEIN
Base Unit of Measure
UNIT
3
0
T006
MEINS
PLNBEZ
Material Number
CHAR
40
0
MARA
MATNR
PLNTY
Task List Type
CHAR
1
0
PLNTY
PLNNR
Key for Task List Group
CHAR
8
0
PLNNR
PLNAW
Application of the task list
CHAR
1
0
TCA09
PLNAW
PLNAL
Group Counter
CHAR
2
0
PLNAL
PVERW
Task List Usage
CHAR
3
0
T411
PLN_VERWE
PLAUF
Date for Routing Explosion
DATS
8
0
CO_PLAUF
PLSVB
Maximum Lot Size
QUAN
13
3
LOSGRBIS
PLNME
Task List Unit of Measure
UNIT
3
0
T006
PLNME
PLSVN
Minimum Lot Size
QUAN
13
3
LOSGRVON
PDATV
Valid-From Date
DATS
8
0
DATUV
PAENR
Change Number
CHAR
12
0
AENR
AENNR
PLGRP
Responsible Planner Group or Department
CHAR
3
0
T024A
VAGRP
LODIV
Lot size divisor (not used)
QUAN
13
3
LOSDIV
STLTY
BOM category
CHAR
1
0
STLTY
Possible values
D
Document Structure
E
Equipment BOM
K
Order BOM
M
Material BOM
P
Work Breakdown Structure BOM
S
Standard BOM
T
Functional Location BOM
STLBEZ
Material Number
CHAR
40
0
MARA
MATNR
STLST
Bill of Material Status
NUMC
2
0
T415S
STLST
STLNR
Bill of Material
CHAR
8
0
STNUM
SDATV
Valid-From Date
DATS
8
0
DATUV
SBMNG
Base quantity
QUAN
13
3
BASMN
SBMEH
Base Unit of Measure
UNIT
3
0
T006
MEINS
SAENR
Change Number
CHAR
12
0
AENR
AENNR
STLAL
Alternative BOM
CHAR
2
0
STALT
STLAN
BOM Usage
CHAR
1
0
T416
STLAN
SLSVN
From Lot Size
QUAN
13
3
LOSVN
SLSBS
To Lot Size
QUAN
13
3
LOSBS
AUFLD
Date of BOM Explosion/Routing Transfer
DATS
8
0
CO_AUFLD
DISPO
MRP controller for the order
CHAR
3
0
T024D
CO_DISPO
AUFPL
Routing number of operations in the order
NUMC
10
0
CO_AUFPL
FEVOR
Production Supervisor
CHAR
3
0
T024F
FEVOR
FHORI
Scheduling Margin Key for Floats
CHAR
3
0
T436A
FHORI
TERKZ
Scheduling type
CHAR
1
0
T482
TERMKZ
REDKZ
Reduction indicator for scheduling
CHAR
1
0
REDKZ
Possible values
No reduction carried out
1
Reduction level 1
2
Reduction level 2
3
Reduction level 3
4
Reduction level 4
5
Reduction level 5
6
Reduction level 6
APRIO
Order priority
CHAR
1
0
CO_APRIO
NTZUE
Superior network number
CHAR
12
0
AUFK
NETZ_UEBER
VORUE
Superior activity
CHAR
4
0
VORG_UEBER
PROFID
Network Profile
CHAR
7
0
TCN41
PROFIDNZPL
VORGZ
Float before production (in days)
NUMC
3
0
VORGZ
SICHZ
Float after production (in days)
NUMC
3
0
SICHZ
FREIZ
Release period (in days)
NUMC
3
0
FREIZ
UPTER
Indicator: Change to Scheduled Dates
CHAR
1
0
CO_UPTER
BEDID
ID of the Capacity Requirements Record
NUMC
12
0
BEDID
PRONR
Project definition
NUMC
8
0
PROJ
PS_PSP_PRO
ZAEHL
Internal counter
NUMC
8
0
CIM_COUNT
MZAEHL
Internal counter
NUMC
8
0
CIM_COUNT
ZKRIZ
Counter for Additional Criteria
NUMC
7
0
DZKRIZ
PRUEFLOS
Inspection Lot Number
NUMC
12
0
QPLOS
KLVARP
Costing Variant for Planned Costs
CHAR
4
0
KALKVARPLN
KLVARI
Costing Variant For Actual Costs
CHAR
4
0
KALKVARIST
RGEKZ
Indicator: Backflushing for order
CHAR
1
0
CO_RGEKZ
Possible values
1
Backflush components during goods receipt
2
Backflush all components during goods receipt
PLART
Basis for scheduling
CHAR
1
0
PS_PLART
Possible values
1
Basic dates
2
Forecast dates
FLG_AOB
Indicator: relationships
CHAR
1
0
FLG_AOB
FLG_ARBEI
Indicator: Default value work is relevant
CHAR
1
0
FLG_ARBEI
GLTPP
Finish date (forecast)
DATS
8
0
CO_GLTPP
GSTPP
Forecast start date
DATS
8
0
CO_GSTPP
GLTPS
Scheduled forecast finish
DATS
8
0
CO_GLTPS
GSTPS
Scheduled forecast start
DATS
8
0
CO_GSTPS
FTRPS
Scheduled release date (forecast)
DATS
8
0
CO_FTRPS
RDKZP
Reduction indicator for scheduling (forecast)
CHAR
1
0
REDKZP
TRKZP
Scheduling type (forecast)
CHAR
1
0
TERMKZP
RUECK
Completion confirmation number for the operation
NUMC
10
0
CO_RUECK
RMZHL
Internal counter
NUMC
8
0
CIM_COUNT
IGMNG
Confirmed Yield Quantity From Order Confirmation
QUAN
13
3
CO_IGMNG
RATID
-INVALID FOR S/4- Index for the rslts of schedg prod. rates
NUMC
12
0
RATID
GROID
-INVALID FOR S/4- Index for rough scheduling results
NUMC
12
0
GROID
CUOBJ
Configuration (internal object number)
NUMC
18
0
CUOBJ
GLUZS
Scheduled finish time
TIMS
6
0
CO_GLUZS
GSUZS
Scheduled Start (Time)
TIMS
6
0
CO_GSUZS
REVLV
Revision Level
CHAR
2
0
REVLV
RSHTY
Object types of the CIM resource
CHAR
2
0
CR_OBJTY
Possible values
A
Work Center
AA
Work center alias
FH
Production resources/tools
G
Group
H
Hierarchy
RSHID
Object ID of the resource
NUMC
8
0
CRID
CR_OBJID
RSNTY
Object types of the CIM resource
CHAR
2
0
CR_OBJTY
Possible values
A
Work Center
AA
Work center alias
FH
Production resources/tools
G
Group
H
Hierarchy
RSNID
Object ID of the resource
NUMC
8
0
CRID
CR_OBJID
NAUTERM
Indicator: Do not schedule automatically
CHAR
1
0
CO_NAUTERM
NAUCOST
Indicator: Do not cost automatically
CHAR
1
0
CO_NAUCOST
STUFE
Level (in multi-level BOM explosions)
DEC
2
0
HISTU
WEGXX
Path (for multi-level BOM explosions)
DEC
4
0
WEGXX
VWEGX
Path (for multi-level BOM explosions)
DEC
4
0
WEGXX
ARSNR
Number of reservation/dependent requirements
NUMC
10
0
RSNUM
ARSPS
Order item number
NUMC
4
0
CO_POSNR
MAUFNR
Number of Superior Order
CHAR
12
0
MAUFNR
LKNOT
Left node in collective order
CHAR
12
0
CO_LKNOT
RKNOT
Right node of a collective order
CHAR
12
0
CO_RKNOT
PRODNET
Order is Part of Collective Order
CHAR
1
0
CO_PRODNET
IASMG
Confirmed Scrap Quantity From Order Confirmation
QUAN
13
3
CO_IASMG
ABARB
Confirmation: Degree of processing
NUMC
3
0
CO_ABARB
AUFNT
Number of superior network
CHAR
12
0
CO_TEILNET
AUFPT
Routing number of operations in the order
NUMC
10
0
CO_AUFPL
APLZT
General counter for order
NUMC
8
0
CO_APLZL
NO_DISP
Effective for Materials Planning
CHAR
1
0
NO_DISP_PLUS
Possible values
Relevant to materials planning
1
Not relevant to materials planning
B
Immediately with blocking indicator
X
Relevant to materials planning at a defined time
CSPLIT
Apportionment Structure
CHAR
4
0
MAKV
CSPLIT
AENNR
Change Number
CHAR
12
0
AENR
AENNR
CY_SEQNR
Sequence Number Order
NUMC
14
0
CY_SEQNR
BREAKS
Indicator: Scheduling allowing for breaks
CHAR
1
0
BREAKS
VORGZ_TRM
Scheduled float before production in days
DEC
6
3
VORGZ_TRM
SICHZ_TRM
Scheduled float after production in days
DEC
6
3
SICHZ_TRM
TRMDT
Date of the Last Scheduling
DATS
8
0
TRMDT
GLUZP
Basic Finish (Time)
TIMS
6
0
CO_GLUZP
GSUZP
Basic Start (Time)
TIMS
6
0
CO_GSUZP
GSUZI
Actual start time
TIMS
6
0
CO_GSUZI
GEUZI
Confirmed Order Finish (Time)
TIMS
6
0
CO_GEUZI
GLUPP
Forecast finish (time)
TIMS
6
0
CO_GLUPP
GSUPP
Forecast start (time)
TIMS
6
0
CO_GSUPP
GLUPS
Scheduled forecast finish time
TIMS
6
0
CO_GLUPS
GSUPS
Scheduled start time (Forecast)
TIMS
6
0
CO_GSUPS
CHSCH
Search Procedure for Batch Determination
CHAR
6
0
T683
KALSMA_CH
KAPT_VORGZ
Float (bef. production) remaining after finite scheduling
NUMC
3
0
KAPT_VORGZ
KAPT_SICHZ
Remaining float after finite scheduling
NUMC
3
0
KAPT_SICHZ
LEAD_AUFNR
Leading Order in Current Processing
CHAR
12
0
AUFK
CO_LAUFNR
PNETSTARTD
Outline start of collective network (date)
DATS
8
0
CO_PSTARTD
PNETSTARTT
Start time of a collective order
TIMS
6
0
CO_PSTARTT
PNETENDD
Outline finish of collective order (date)
DATS
8
0
CO_PENDD
PNETENDT
Outline finish time
TIMS
6
0
CO_PENDT
KBED
Indicator: Do not Create Capacity Requirements
CHAR
1
0
KBED_D
KKALKR
Indicator: Components will not be costed
CHAR
1
0
COMP_CALC
SFCPF
Production Scheduling Profile
CHAR
6
0
TCO43
CO_PRODPRF
RMNGA
Total Confirmed Rework Quantity
QUAN
13
3
RMNGA
GSBTR
Total Commitment Date
DATS
8
0
CO_GSBTR
VFMNG
Committed quantity for order acc. to ATP check components
QUAN
13
3
CO_VFMNG
NOPCOST
Do not calculate planned costs for order
CHAR
1
0
CO_NOPCOST
NETZKONT
Indicator for the account assignment of a network(hdr/act.)
CHAR
1
0
NETZKONT
Possible values
Account assignment determined by status
1
Header-assigned network
2
Activity-assigned network
ATRKZ
Request ID
CHAR
1
0
ATRKZ
Possible values
Standard request
B
TOI - Order (created using BAPI)
E
MOP - Order (previously EOG)
L
LPP - Order
M
Multi-Item Order
T
Segmentation Order
U
Original Order
Z
Combined Order
OBJTYPE
Change indicator
CHAR
1
0
OCM_OBJ_TYPE
Possible values
Normal object
+
Object created
-
Object is to be deleted
0
Zero Object
C
Object changed
M
Object reassigned
CH_PROC
Process that has lead to the change of an object
CHAR
1
0
OCM_CH_PROC
Possible values
Not changed
1
Manually changed
2
Change sales order
3
Release of change number
4
Change assembly order
5
Change number supplement
6
Change number shift
7
Direct assignment
KAPVERSA
Version of Available Capacity
NUMC
2
0
KAPVERSA
COLORDPROC
Collective order with/without automatic goods movement
CHAR
1
0
CO_COLORDPRC
Possible values
Collective order without automatic goods movement
X
Collective order with automatic goods movement
KZERB
Indicator: Project summarization via master data charact.
CHAR
1
0
PS_KZERB
CONF_KEY
Identical object
NUMC
8
0
CC_CONF_KEY
ST_ARBID
Object ID
NUMC
8
0
OBJEKTID
VSNMR_V
Sales document version number
CHAR
12
0
VSNMR_V
TERHW
Scheduling note from order scheduling
CHAR
1
0
TERHW
Possible values
No scheduling note
1
Basic finish date is before scheduled finish
2
Automatically carried out today scheduling
SPLSTAT
Status of an Order in a Split Hierarchy
CHAR
1
0
SPLIT_STAT
Possible values
not split, not created by splitting
1
split
2
created by splitting
3
created by splitting and split
COSTUPD
Costs are updated
CHAR
1
0
CN_COSTUPD
MAX_GAMNG
Maximum Value of Total Order Quantity After Distribution
QUAN
13
3
CO_MES_MAX_GAMNG
MES_ROUTINGID
Key of a Routing from an ME System
CHAR
64
0
CO_MES_INT_ROUTINGID
TL_VERSN
Routing Version
CHAR
4
0
PLNVERSN
BOM_VERSN
BOM Version
CHAR
4
0
CS_VERSN
FLEXIBLE_PROCESSING
Flexible Processing
CHAR
1
0
MPE_FLEXIBLE_PROCESSING
ADPSP
PM/PS Reference Element
CHAR
40
0
ADCOMPARE
RMANR
Sales and Distribution Document Number
CHAR
10
0
VBELN
POSNR_RMA
Item number of the SD document
NUMC
6
0
POSNR
POSNV_RMA
Item number of the SD document
NUMC
6
0
POSNR
CFB_MAXLZ
Maximum Storage Period
DEC
5
0
MAXLZ
CFB_LZEIH
Unit for maximum storage period
UNIT
3
0
T006
LZEIH
CFB_ADTDAYS
Additional Days
DEC
4
0
CFB_ADTDAYS
CFB_DATOFM
Date of Manufacture
DATS
8
0
CFB_DATOFM
CFB_BBDPI
Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED)
DATS
8
0
CFB_BBD_PPPI
FSH_MPROD_ORD
Master Production Order Number
CHAR
12
0
FSH_MPROD
FSH_MPROD_ORD
FLG_BUNDLE
Indicates Bundle Information Maintained
CHAR
1
0
FLG_BUNDLE
MILL_RATIO
Factor for Quantity-Based Settlement
INT4
10
0
MILL_RATIO
BMEINS
Base Unit of Measure
UNIT
3
0
MEINS
BMENGE
Base quantity
QUAN
13
3
BASMN
MILL_OC_ZUSKZ
Combination Indicator
CHAR
1
0
MILL_OC_ZUSKZ
Possible values
H
Combination by Order
O
Combination by Operation